ORDINANCE NO. O-03-2011
AN
ORDINANCE CONFIRMING THE
WHEREAS, a public hearing was conducted on March 23, 2010
regarding streets resurfacing improvements to Arno
Avenue, Crescent Court, Deshler Lane, Huntemann Lane,
Rob Roy Avenue, Sterling Avenue and Midway Court; and
WHEREAS, bids were solicited for street resurfacing
improvements to the said streets; and
WHEREAS, an Ordinance ordering the street resurfacing
improvements to said streets was adopted by the Board of Council on May 17,
2010 which established the assessments to abutting property owners; and
WHEREAS, the
city, through is Public Works Committee of Council, staff and engineer,
inspected said improvements and recommended acceptance of same.
NOW,
THEREFORE, BE IT ORDAINED BY THE
SECTION I
That the Public Works Committee of
the Board of Council of the City of Fort Thomas, Kentucky, and the City
Engineer of said City recommend the acceptance of the improvement of Arno Avenue from its intersection with Rossford
Avenue to its terminus; performed by spot curb repair for areas that
have deteriorated, mudjacking as required to fill any
voids or cavities underneath the pavement, full depth pavement repair as
necessary, excavating and grading at end of street for 20’ extension, subgrade compaction, asphalt base course installation and
6” vertical concrete curb, bituminous asphalt pavement surface milling,
removing asphalt overlay to concrete base pavement, asphalt leveling course of
variable thickness (3/4" to 1-1/4") asphalt leveling to reconstruct the
crown on the street as necessary, asphalt resurfacing: 1-1/2" asphalt to
be applied on top of the leveling course, raising manholes, and adjusting
downspouts that lead to the curb as necessary;
That the Public Works Committee of the Board of
Council of the City of Fort Thomas, Kentucky, and the City Engineer of said
City recommend the acceptance of the improvement of Crescent Court from its intersection with Crescent Avenue to its
terminus; performed by mudjacking as required
to fill any voids or cavities underneath the pavement, full depth pavement
repair as necessary, sawcutting and removing existing
curb and constructing new 4” vertical concrete curb, depressed at driveways and
filling behind new curb with topsoil, bituminous asphalt pavement surface
milling, removing asphalt patches to original gutter line or concrete base,
asphalt leveling course of variable thickness (3/4" to 1-1/4")
asphalt leveling to reconstruct the crown on the street as necessary, asphalt
resurfacing: 1-1/2" asphalt to be
applied on top of the leveling course, raising manholes, and adjusting
downspouts that lead to the curb as necessary.
That the Public Works Committee of the Board of
Council of the City of Fort Thomas, Kentucky, and the City Engineer of said
City recommend the acceptance of the improvement of Deshler Lane from its intersection with Highland Avenue to its terminus;
performed by mudjacking as required to fill
any voids or cavities underneath the pavement, full depth pavement repair as
necessary, bituminous asphalt pavement surface milling, removing asphalt
patches to original gutter line and concrete base including removal of existing
concrete curb, partial cul-de-sac island removal, subgrade
compaction and asphalt base course installation, asphalt leveling course of
variable thickness (3/4" to 1-1/4") asphalt leveling to reconstruct
the crown on the street as necessary, constructing new 4” vertical concrete
curb, depressed at driveways and filling behind new curb with topsoil, pavement
fabric, asphalt resurfacing: 1-1/4"
asphalt to be applied on top of the leveling course, raising manholes, driveway
alignment, and adjusting downspouts that lead to the curb as necessary.
That the Public Works Committee of the Board of
Council of the City of Fort Thomas, Kentucky, and the City Engineer of said
City recommend the acceptance of the improvement of Huntemann Lane from its intersection with Newman
Avenue to its terminus; performed by spot curb repair for areas
that have deteriorated, mudjacking as required to
fill any voids or cavities underneath the pavement, full depth pavement repair
as necessary, bituminous asphalt pavement surface milling of variable depth of
3” at gutter line to 1-1/2” at centerline, removing asphalt patches to original
gutter line, asphalt leveling course of variable thickness (1-1/2" to
2-1/2") asphalt leveling to reconstruct the crown on the street as
necessary, asphalt resurfacing:
1-1/2" asphalt to be applied on top of the leveling course, raising
manholes, and adjusting downspouts that lead to the curb as necessary.
That the Public Works Committee of the Board of
Council of the City of Fort Thomas, Kentucky, and the City Engineer of said
City recommend the acceptance of the improvement of Rob Roy Avenue from its intersection with N. Fort Thomas Avenue to its intersection
with Burnet Ridge; performed by spot curb repair for areas that have
deteriorated, mudjacking as required to fill any
voids or cavities underneath the pavement, full depth pavement repair as
necessary, bituminous asphalt pavement surface milling, removing asphalt
overlay to original gutter line, asphalt leveling course of variable thickness
(3/4" to 1-1/4") asphalt leveling to reconstruct the crown on the
street as necessary, pavement fabric, asphalt resurfacing: 1-1/2" asphalt
to be applied on top of the leveling course, raising manholes, and adjusting
downspouts that lead to the curb as necessary.
That the Public Works Committee of the Board of
Council of the City of Fort Thomas, Kentucky, and the City Engineer of said
City recommend the acceptance of the improvement of Sterling Avenue from its intersection with N. Fort Thomas Avenue to its terminus;
performed by spot curb repair for areas
that have deteriorated, mudjacking as required to
fill any voids or cavities underneath the pavement, full depth pavement repair
as necessary, bituminous asphalt pavement surface milling, removing asphalt
overlay to original gutter line, asphalt leveling course of variable thickness
(3/4" to 1-1/4") asphalt leveling to reconstruct the crown on the
street as necessary, pavement fabric, asphalt resurfacing: 1-1/2" asphalt
to be applied on top of the leveling course, raising manholes, and adjusting
downspouts that lead to the curb as necessary.
That the Public Works Committee of the Board of Council of the City of Fort Thomas, Kentucky, and the City Engineer of said City recommend the acceptance of the improvement of Midway Court from its intersection with South Fort Thomas Avenue to its terminus; performed by removal of existing concrete curb, construction of new concrete vertical curb depressed at driveways, asphalt pavement milling, asphalt leveling course of variable thickness (3/4” to 1-1/4”), asphalt resurfacing: 1-1/2” asphalt to be applied on top of the leveling course, and driveway alignment as necessary.
All of these improvements have been
constructed in accordance with the plans and specifications thereof as
submitted by the City Engineer, and the Board of Council, on the advice of the
Public Works Committee and the City Engineer, who deem the work completed; and
said work is hereby declared to be completed and the City Engineer’s estimate
of the cost to said improvement and the Certificate of apportionment are hereby
accepted, approved, and confirmed.
SECTION II
That special assessment rates as set
out below per linear foot and fronting on listed streets, be and the same is
hereby apportioned, levied, and assessed against said real estate and the
owners thereof (see attached Exhibit “A”) at the stated cost per foot, as set
out as follows:
STREET
FRONT FT COST FRONT FT COST FINAL
COST
CITY PORTION PPTY OWNR
PORTION
Crescent
Court $ 7.83 $ 7.83 $ 9,759.79
Rob
Midway
Court $ 5.42 $ 5.42 $ 5,023.86
SECTION III
Payments for all improvements shall
be due within forty-five (45) days of the publication of the Ordinance of
Apportionment and any assessment levied that is not paid when due shall bear a
penalty of five percent (5%). An
additional ten percent (10%) penalty will be levied thirty-one (31) days after
the due date, and any unpaid assessment shall accrue eight percent (8%) per
annum interest, except for those property owners participating in the
Installment Payment Plan, as outlined below, and shall continue to accrue and
be liable as provided by law. The City’s
portion of the entire improvement cost shall be paid within thirty (30) days
from the acceptance of said work under the contract.
INSTALLMENT
PAYMENT PLAN
A property owner may have the option
to finance the payment of their assessment bill over a specified period of time
subject to the total amount of their assessment. Property owners with assessment bills of more
than $400, but less than $1,000 may finance their bill over a three (3) year
period with equal principal payments.
Property owners with assessment bills of more than $1,000 may finance
their bill over a five (5) year period with equal principal payments. The total amount of the assessment to qualify
for the improvement installment plan shall not be less than $400. An interest rate of eight per cent (8%) per
annum shall be levied on the unpaid portion of the balance. The first annual installment shall become due
and payable on July 1, following the year in which the project was completed.
Any interested property owner qualifying
for the improvement Installment Payment Plan shall initiate this process by
completing an Installment Agreement Form with the City’s Director of Finance
within thirty (30) days of the publication of the Ordinance of Apportionment. A non-refundable administrative fee of
thirty-five dollars ($35) shall be required to process the Installment
Agreement Application Form. Installment
payments shall be made to the Finance Office on or before July 31 of each year
as outlined in the Agreement.
If any property owner fails to make
their installment payment by July 31 of each year as outlined in the Agreement,
the entire unpaid balance will become due immediately and payable in full with
no recourse. The City shall exercise its
rights to proceed to collect all amounts in default of improvement assessment
bills by initiating appropriate legal action.
SECTION IV
The City Clerk is hereby directed to
publish an abstract of this Ordinance in the manner provided by law for general
ordinances of the City.
SECTION V
The City Treasurer shall, at the
time that the afore-mentioned Ordinance is published, or one week thereafter,
give notice by distribution of assessment bills requiring all property owners
to pay the improvement tax levied in accordance with Section III of this
Ordinance.
SECTION VI
This Ordinance shall be in full
force and effect from and after its passage, approval and publication as
designated by law.
APPROVED:
_______________________
Mary
H. Brown, Mayor
1st
ADOPTED:
ATTEST:
__________________________
Melissa
Kaye Kelly, City Clerk
Published: Recorder
|
MailingAddress |
City, State, Zip |
Street Address |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
|
KREMER
MICHAEL |
|
FT
|
|
14-780.00 |
8.11% |
75.34 |
7.44 |
560.53 |
|
OWENS
NIKELA S & ORDONEZ MIGUEL |
|
FT
|
|
17-414.00 |
9.99% |
92.76 |
7.44 |
690.13 |
|
KOSTER JEREMY & SHANK STEFANIE |
|
FT
|
|
17-412.00 |
5.92% |
55.00 |
7.44 |
409.20 |
|
BRYANT
DOUGLAS F & KACIE F |
|
FT
|
|
14-262.00 |
5.92% |
55.00 |
7.44 |
409.20 |
|
BIEDENHARN JAMES T & TONI L |
|
FT
|
|
12-493.00 |
4.87% |
45.23 |
7.44 |
336.51 |
|
BIEDENHARN JAMES T & TONI L |
|
FT
|
|
12-494.00 |
2.21% |
20.50 |
7.44 |
152.52 |
|
|
|
FT |
|
13-993.00 |
2.21% |
20.50 |
7.44 |
152.52 |
|
VENABLE
MICHAEL |
|
FT
|
|
13-563.00 |
10.77% |
100.00 |
7.44 |
744.00 |
|
|
|
|
|
Total |
50.00% |
464.33 |
|
3454.62 |
|
MailingAddress |
City, State, Zip |
Street Address |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
|
MOORE
PATRICK G & |
1
CRESCENT CT. |
FT
|
1
CRESCENT CT. |
13-744.00 |
4.01% |
50.00 |
7.83 |
391.50 |
|
ARNZEN ROBERT L & JOANNE G |
|
FT
|
2-4
|
12-265.00 |
4.59% |
57.22 |
7.83 |
448.03 |
|
AN
TONY H |
3
CRESCENT CT. |
FT
|
3
CRESCENT CT. |
13-194.00 |
3.21% |
40.00 |
7.83 |
313.20 |
|
EMERY
DAVID E |
5
CRESCENT CT. |
FT
|
5
CRESCENT CT. |
13-375.00 |
3.21% |
40.00 |
7.83 |
313.20 |
|
WOOD
THOMAS J |
6
CRESCENT COURT |
FT
|
6
CRESCENT CT. |
17-440.00 |
3.21% |
40.00 |
7.83 |
313.20 |
|
KREMER
LAURA M PARKS |
7
CRESCENT CT. |
FT
|
7
CRESCENT CT. |
17-423.00 |
3.09% |
38.50 |
7.83 |
301.46 |
|
JUETT PHYLLIS & JEFFREY |
|
|
8
CRESCENT CT. |
17-124.00 |
3.21% |
40.00 |
7.83 |
313.20 |
|
HAAS
STEVEN T |
9
CRESCENT CT. |
FT
|
9
CRESCENT CT. |
15-688.00 |
1.56% |
19.50 |
7.83 |
152.69 |
|
HEDGER
MILDRED B |
10
CRESCENT CT. |
FT
|
10
CRESCENT CT. |
14-138.00 |
4.65% |
58.00 |
7.83 |
454.14 |
|
REED MARK
& CHARLOTTE |
37 N
CRESCENT CT. |
FT |
|
14-919.00 |
8.02% |
100.00 |
7.83 |
783.00 |
|
SCHIFF
PETER & PHYLLIS |
41 N
CRESCENT CT. |
FT |
|
16-262.00 |
8.02% |
100.00 |
7.83 |
783.00 |
|
|
|
FT |
|
15-954.00 |
3.21% |
40.00 |
7.83 |
313.20 |
|
|
|
|
|
Total |
50.00% |
623.22 |
|
4879.81 |
|
MailingAddress |
City, State, Zip |
Street Address |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
|
ETTER REBECCA |
|
|
|
16-565.00 |
1.78% |
75.04 |
9.77 |
733.14 |
|
TATE
ERIC & JANA BETH FETTIG |
|
|
|
13-174.00 |
2.25% |
95.13 |
9.77 |
929.42 |
|
WEITKAMP ROBERT & VIRGINIA S |
|
|
|
17-227.00 |
1.78% |
75.05 |
9.77 |
733.24 |
|
ADLER
TIMOTHY & KATHRYN |
|
|
|
13-418.00 |
2.04% |
86.02 |
9.77 |
840.42 |
|
PARTNER
HOMES LLC |
|
|
|
16-234.00 |
1.78% |
75.11 |
9.77 |
733.82 |
|
ROOT
JACK H & CAROL A |
|
|
|
16-106.00 |
2.28% |
96.16 |
9.77 |
939.48 |
|
ROSE
|
|
|
|
16-112.00 |
1.79% |
75.67 |
9.77 |
739.30 |
|
ORRENDER WILLIAM J & KAREN R |
|
|
|
14-917.00 |
1.80% |
76.14 |
9.77 |
743.89 |
|
WRIGHT
JOHN & HELEN D |
|
|
|
13-492.00 |
2.01% |
85.07 |
9.77 |
831.13 |
|
POLLARD
STEPHEN C |
|
|
|
15-789.00 |
1.19% |
50.41 |
9.77 |
492.51 |
|
ALLEN
JEFFREY & LAURA TRUSTEE |
|
|
|
14-160.00 |
1.78% |
75.06 |
9.77 |
733.34 |
|
KOENIG
HARRY R & BETTY J |
|
|
|
14-730.00 |
1.77% |
75.00 |
9.77 |
732.75 |
|
HAUCK
OWEN K |
|
|
|
14-102.00 |
2.37% |
100.00 |
9.77 |
977.00 |
|
BURWICK |
|
|
|
15-280.00 |
1.78% |
75.03 |
9.77 |
733.04 |
|
KREBS
S DANIEL & MAUREEN A |
|
|
|
14-713.00 |
1.78% |
75.27 |
9.77 |
735.39 |
|
|
|
|
|
12-235.00 |
2.93% |
123.99 |
9.77 |
1211.38 |
|
ODOM
HIROKO & WRIGHT HELEN D |
|
|
|
17-112.00 |
3.05% |
128.81 |
9.77 |
1258.47 |
|
ORMSBEE MARILYN A |
|
|
|
15-344.00 |
2.47% |
104.45 |
9.77 |
1020.48 |
|
|
|
|
|
12-380.00 |
2.79% |
118.07 |
9.77 |
1153.54 |
|
HURTT JACK & SANDRA |
|
|
|
16-154.00 |
1.29% |
54.63 |
9.77 |
533.74 |
|
MATTINGLY
TIMOTHY & PENELOPE |
|
|
|
12-509.00 |
1.25% |
52.73 |
9.77 |
515.17 |
|
THOMPSON
|
|
|
|
15-145.00 |
1.29% |
54.72 |
9.77 |
534.61 |
|
BROERING INVESTMENT LLC |
|
|
|
12-653.00 |
3.39% |
143.45 |
9.77 |
1401.51 |
|
LAUDER
GLORIA & ARTHUR |
|
|
|
15-874.00 |
3.36% |
142.00 |
9.77 |
1387.34 |
|
|
|
|
|
Total |
50.00% |
2113.01 |
|
20644.11 |
|
MailingAddress |
City, State, Zip |
Street
Address |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
|
EAGLE
VIEW CONDO HOA
C/O TOWNE PROPERTIES |
|
|
|
37-280.00 |
12.04% |
808.35 |
9.25 |
7477.24 |
|
|
12
GUNPOWDER RIDGE |
FT
|
|
14-914.01 |
6.80% |
456.70 |
9.25 |
4224.48 |
|
CONNETT |
|
FT
|
|
11-755.00 |
1.04% |
70.00 |
9.25 |
647.50 |
|
WARF
HARLESS E & CAROL A |
|
FT
|
|
12-050.00 |
1.49% |
100.00 |
9.25 |
925.00 |
|
FLEDDERMAN EARL & BERTHA |
|
FT
|
|
11-789.00 |
0.89% |
60.00 |
9.25 |
555.00 |
|
CULBERTSON
WM C JR & ELIZABETH |
|
FT
|
|
11-757.00 |
1.04% |
70.00 |
9.25 |
647.50 |
|
MILLER
STEPHEN C & CHARLOTTE A |
|
FT
|
|
11-914.00 |
2.37% |
159.20 |
9.25 |
1472.60 |
|
KUHL DENNIS E & SANDRA |
|
FT
|
|
12-074.00 |
1.04% |
70.00 |
9.25 |
647.50 |
|
PLYE RICHARD W & AUDREY A |
|
FT
|
|
11-938.00 |
1.09% |
73.36 |
9.25 |
678.58 |
|
KNOX
MARJORIE |
|
FT
|
|
11-827.00 |
0.89% |
60.00 |
9.25 |
555.00 |
|
VOGEL
BARBARA E |
|
FT
|
|
12-043.00 |
0.74% |
50.00 |
9.25 |
462.50 |
|
CLIFFGATE HOMEOWNERS ASSOC. C/O TOWNE PROPERTIES |
|
|
|
00-000.04 |
7.33% |
491.99 |
9.25 |
4550.91 |
|
LW LIMITED C/O NORTH AMERICAN PROPERTIES |
|
|
|
14-832.00 |
3.15% |
211.44 |
9.25 |
1955.82 |
|
PATRICIA
STRATMAN |
|
FT.
|
|
16-769.00 |
7.08% |
474.92 |
9.25 |
4393.01 |
|
NOB HILL HOMEOWNERS ASSOC. C/O TOWNE PROPERTIES |
|
|
|
00-000.00 |
0.74% |
50.00 |
9.25 |
462.50 |
|
THOMAS
POINTE HOA
C/O ROBERT LUDKE PRES. |
|
FT.
|
|
00-000.00 |
1.49% |
99.78 |
9.25 |
922.97 |
|
|
|
FT |
KATHLOU CT. R-O-W |
00.000.00 |
0.74% |
50.00 |
9.25 |
462.50 |
|
|
|
|
|
Total |
50.00% |
3355.74 |
|
29655.13 |
|
MailingAddress |
City, State, Zip |
Street Address |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
|
|
|
FT.
|
|
15-525.00 |
10.42% |
247.12 |
9.53 |
2355.05 |
|
TAUL L NELSON & MARGARET B |
|
FT.
|
|
15-753.00 |
2.11% |
50.00 |
9.53 |
476.50 |
|
DMR PROPERTIES LLC |
90
ORCHARD HILL |
FT.
|
|
15-362.00 |
3.95% |
93.60 |
9.53 |
892.01 |
|
ROSE
JOHN G & JUDITH M |
|
FT.
|
|
13-291.00 |
7.92% |
188.00 |
9.53 |
1791.64 |
|
BENES OLIVER J |
|
FT.
|
|
14-344.00 |
1.69% |
40.00 |
9.53 |
381.20 |
|
WALTER
MOLLY& KUES ROBERT JR |
|
FT.
|
|
15-962.00 |
2.11% |
50.00 |
9.53 |
476.50 |
|
TINKER
JAMES A & MELISSA M |
|
FT.
|
|
15-165.00 |
2.11% |
50.00 |
9.53 |
476.50 |
|
GIBERSON LORI S |
|
FT.
|
|
14-079.00 |
4.31% |
102.20 |
9.53 |
973.97 |
|
OSBURG DAVID & HOLLY |
42
ROB |
FT.
|
|
12-242.00 |
7.47% |
177.23 |
9.53 |
1689.00 |
|
HILL
CHAS & PAMELA |
|
FT.
|
|
14-245.00 |
5.82% |
138.00 |
9.53 |
1315.14 |
|
|
|
FT.
|
|
00-000.00 |
2.11% |
50.00 |
9.53 |
476.50 |
|
|
|
|
|
Total |
50.00% |
1186.15 |
|
11304.01 |
|
Name |
MailingAddress |
City, State, Zip |
AssessedAddress |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
RICHARDSON,
BONNIE |
|
FT.
|
|
12-872.00 |
3.18% |
29.45 |
5.42 |
159.62 |
|
CLAY,
GREENE B. & BARBARA |
|
FT.
|
|
12-906.00 |
4.32% |
40.00 |
5.42 |
216.80 |
|
LUTKENHOFF, ERIC & JULIA |
|
|
|
13-443.00 |
4.32% |
40.00 |
5.42 |
216.80 |
|
KRAMER,
RUSTY J. & AMANDA |
|
FT.
|
|
16-089.00 |
3.88% |
36.00 |
5.42 |
195.12 |
|
PCK INVESTMENTS LLC |
|
|
|
16-430.00 |
12.50% |
115.80 |
5.42 |
627.64 |
|
WINBURN, MELBA |
|
FT.
|
|
17-367.00 |
2.83% |
26.19 |
5.42 |
141.95 |
|
MASTERS,
JIM & LISA |
|
|
|
14-693.00 |
9.05% |
83.90 |
5.42 |
454.74 |
|
WARD,
MYRNA |
|
FT.
|
|
15-724.00 |
9.93% |
92.00 |
5.42 |
498.64 |
|
|
|
|
|
Total |
50.00% |
463.34 |
|
2511.30 |
|
MailingAddress |
City, State, Zip |
Street Address |
PIDN |
% of Project |
Frontage |
PerFoot |
Total |
|
|
HILL
CHAS F & PAMELA J |
|
FT.
|
|
14-245.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
HEIERT PATRICK J |
|
FT.
|
|
14-153.00 |
0.67% |
25.00 |
9.44 |
236.00 |
|
BANKEMPER MARIAN M |
34
SUNSET |
FT.
|
|
15-158.00 |
1.46% |
54.00 |
9.44 |
509.76 |
|
STANGER WILLIAM A |
|
FT.
|
|
16-666.00 |
2.02% |
75.00 |
9.44 |
708.00 |
|
SCHULKERS EUGENE W & |
|
FT.
|
|
16-363.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
THOMAS
DALE A |
|
|
|
16-883.00 |
1.46% |
54.00 |
9.44 |
509.76 |
|
VOGEL
CHRISTOPHER & |
|
FT.
|
|
17-060.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
HARGER BRYON & ANGELA |
|
FT.
|
|
12-376.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
FROST
WM R & SHARON A |
|
FT.
|
|
13-630.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
|
|
FT.
|
|
13-229.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
DOMIZLAFF PAMELA |
|
FT.
|
|
14-743.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
HEILMAN JAMES R |
|
FT.
|
|
14-518.00 |
2.42% |
89.77 |
9.44 |
847.43 |
|
THURMAN
PAMELA L |
|
FT.
|
|
16-921.00 |
1.08% |
40.00 |
9.44 |
377.60 |
|
|
|
FT.
|
|
14-921.00 |
1.05% |
39.07 |
9.44 |
368.82 |
|
BEYERSDOERFER WM & DOROTHY |
|
FT.
|
|
17-080.00 |
1.63% |
60.35 |
9.44 |
569.70 |
|
RARDIN JERRY |
|
|
|
14-989.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
BARRINGER LALLAH |
|
FT.
|
|
12-337.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
BEYERSDOERFER WM & DOROTHY |
|
FT.
|
|
12-478.00 |
1.63% |
60.35 |
9.44 |
569.70 |
|
HEDGER
MILDRED |
|
FT.
|
|
14-137.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
MARTIN
CHRISTOPHER D |
|
FT.
|
|
15-518.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
ARMSTRONG
JASON W & JENNIFER L |
|
FT.
|
|
13-602.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
NEWBANKS JEFFREY S |
|
FT.
|
|
15-667.00 |
0.90% |
33.40 |
9.44 |
315.30 |
|
BRODERICK
JACOB & SHERRI |
|
FT.
|
|
17-102.00 |
1.08% |
40.00 |
9.44 |
377.60 |
|
|
|
FT.
|
|
12-522.00 |
0.90% |
33.40 |
9.44 |
315.30 |
|
PHILIPPE
TERRELL & LANEE E |
|
FT.
|
|
16-907.00 |
1.62% |
60.00 |
9.44 |
566.40 |
|
BAUER
CARLA L |
|
FT.
|
|
14-849.00 |
0.90% |
33.40 |
9.44 |
315.30 |
|
GLENN
JENNIFER S |
|
FT.
|
|
17-181.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
|
|
FT.
|
|
13-521.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
PATTEN
JOHN GERARD & DORCAS |
|
FT.
|
|
15-681.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
ROSENHAGEN DAVID A |
|
FT.
|
|
16-121.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
MARTIN
BARBARA R |
|
FT.
|
|
15-121.00 |
1.35% |
50.00 |
9.44 |
472.00 |
|
LANGHEIM MEGAN |
|
FT.
|
|
15-122.00 |
1.38% |
50.99 |
9.44 |
481.35 |
|
RICE
GABE M & MARGARET K |
|
FT.
|
|
15-985.00 |
2.16% |
79.91 |
9.44 |
754.35 |
|
STOKES
KEVIN S & DIANE W |
|
FT.
|
|
12-956.00 |
0.79% |
29.42 |
9.44 |
277.72 |
|
DANKEL RAYMOND A |
|
FT.
|
|
14-002.00 |
0.70% |
26.06 |
9.44 |
246.01 |
|
DANKEL RAYMOND A |
|
FT.
|
|
14-000.00 |
0.72% |
26.56 |
9.44 |
250.73 |
|
|
|
FT.
|
|
13-225.00 |
2.48% |
92.00 |
9.44 |
868.48 |
|
|
|
|
|
Total |
50.00% |
1852.68 |
|
17489.30 |